|
Results/Expectations and Operational Plans for 2006-2007 The Board of Education represents the owners of the Gainesville City Schools - all citizens of the district. To this end, the Board has approved expectations, as well as the means to achieve these results. Annual operational plans are being developed to meet each of the goals. Indicators/annual results will be the means of measuring our progress.As a result of the Gainesville City Schools efforts, the Board will hold the Superintendent accountable along with the leadership teams and measure performance utilizing the following goals. Evidence of Success Toward Goals: 2006-2007 School Year GOAL 1: To educate all children in Gainesville City to be successful students. Objective 1: Emphasize individual student achievement in language arts/ reading, mathematics, science, and social studies through increases in test results and high school end-of-course and graduation tests.
Fair Street International
Baccalaureate Academy CRCT Goals: GCSS district goal is to achieve 95% meeting and exceeding standards and 75% exceeding standards.
Interventions: Strategies in place during the instructional day include:
After-school instructional plan:
Home/ School Communication:
Objective 3: Increase the 4th, 6th, and 8th CRCT scores in ‘exceeding expectations’ in reading and math by 5% for each grade. (5.0) Academic Acceleration Plan In preparation for academic success, as determined by test scores on the CRCT, the following interventions and instructional strategies are being used:
Objective 4: Update existing standards and reflect new Georgia Performance Standards for the following:
4.a. Elementary (5.0) October 2006: David Shumake/principals
· Administration and Literacy Coaches are leading implementation by attending workshops provided by the DOE, using the Georgia Standards.org web-site resources, and re-delivering content through faculty professional development and weekly meetings
· All faculty, both classified teaching support, and certified teachers in all areas, participate in workshops on unpacking and delivering the GPS
· Pacing guides for standards are identified for each quarter, pre and post-tested for each student
· Data from Testgate and the Data Utilization Guide provided by the DOE is being used to monitor progress and plan targeted instruction that is standards-driven
· Weekly grade level team meetings are used to analyze standards implementation and results
· Teaching teams have used standards have used backward design to create six units per grade level using Science and Social Studies standards and incorporating other standards in a transdisciplinary approach, incorporating differentiated instructional strategies
· Teachers are creating units in Language Arts and Math that incorporate the new standards in a meaningful, coherent manner, focusing on what students should learn, know, and be able to do. Teachers are spending two hours per week during planning and after school to create units. Units from the Frameworks from DOE and MAGIC plans are incorporated where appropriate.
Objective 5: Increase by 5% the number of students taking AP exams for Class of 2006. (5.0)
January 2007: David Shumake Objective 6: By November 2006 share the plan for GMS laptop implementation and training of staff. (4.5) November 2006: GMS principals
Objective 7: By September 2006 report on status of all schools meeting AYP (Adequate Yearly Progress). (5.0)
September
2006: David Shumake/Shirley Whitaker
Results: With a 98.7% success rate the objective of 100 % AYP was not met. Objective 8: Graduate 95% or more of students with senior status by July 31, 2007. Report to Board by September 2006 and compare Class of 2005 and 2006. (5.0) September 2006: David Shumake
Objective 9: To work with high school to increase the number of students passing the initial graduation exit exam over 2006. Report in May 2007. (5.0) May 2007: David Shumake
Results: Objective 10: GMS and Academies: By August 2006, to identify the middle school initiatives to be implemented for a three-year plan for the 2006-2009 school years. Middle school restructuring for academies, providing better counseling, ownership for each student’s success by all faculty and staff, as well as incorporating an advisement program, similar to the high school are to be implemented. In addition communication channels need to be expanded. The middle school must create the small school mentally that research is promoting and has been achieved in each elementary academy. (5.0) July 2006, November 2006 and May 2007: GMS Principals
Objective 11: For all
students/parents grades 6-12 (GMS academies) to have an annual
conference. Report to the Board in December 2006 and June 2007 a
cumulative report, citing contacts by telephone or in person with
every student. Extended counseling and mentoring must include a
focus on career options and expanded vocational opportunities for
students. To work with the middle/high school counselors to define a
career and academic plan to articulate our students’ progress
complete with a timeline, personnel requirements and staff
development needs. 11.a. Middle School (4.5) August 2006, September 2006, and June 2007: David Shumake/Shirley Whitaker/GMS Principals
11.b. High School (4.5) August 2006, September 2006, and June 2007: David Shumake/Shirley Whitaker/GMS Principals
Objective 12: Increase the SAT scores by 5 points (for the Class of 2006 over the Class of 2005)
12.a. Increase total score for
students completing college prep program by 5 points. (4.0)
12.b. Increase total score for total student population by 5 points. (4.0) November 2006 and January 2007: David Shumake
Objective 13: To maintain student attendance at 95% or improve by 1% over 2005-2006. All students will have a parent conference following the 5th, 10th and 15th absence, per administrative procedure, unless medical conditions are documented. In addition, coordination with community agencies such as courts and family services will be identified and reported. (4.0) December 2006 and June 2007: Curtis Bibb
Objective 14: Establish baseline data for laptops at GHS and usage. (4.0) November 2006: Report by Mike Kemp and Keith Palmer
Objective 15: Maintain the number of minority students taking the ACT and/or SAT. Report in November 2006 data for Class of 2005 and 2006. (4.5) December 2006: David Shumake
Objective 16: To evaluate our interdisciplinary writing plans for our K-12 curriculum by January 2007, including fall 2006 and spring 2007 district-wide writing assessments in grades K-8, including the addition of a science rubric in writing. (4.4) December 2006 and May 2007: David Shumake/Literacy Coaches
Objective 17: Increase the number of students enrolled in Carnegie level courses by 5% in the middle school. By November 2006 cite the number of students for the past three years enrolled in each Carnegie level course. (3.7)
November 2006: GMS principals
Objective 18: Maintain baseline
data of students assigned alternative assessment intervention (IEP,
ESOL) by November 2006, and improve and reduce. Provide a quarterly
report of students exiting the programs with designated time
identified. (3.6)
Fair Street IB Academy Goal I Objective 18
Objective 19: By March 2007 to have the GMS and GHS leadership teams to report on vision for grades 6-12 articulation for athletics, activities, arts and academies. (4.0) March 2007: GHS and GMS Leadership Teams
Objective 20. Review 2006-2007
attendance data for Transitional Academy, G.L.A. and Phoenix Academy
and ‘Fast Track’. Compare to the 2005-2006 year. Cite 2005-2006
students’ progress to: (3.5) Objective 21: To study how to improve nurturing partnerships with daycare providers and after-school programs and share instructional hints and activities. (3.5) Quarterly: Shirley Whitaker GOAL 2: To provide fiscal accountability to the citizens of Gainesville/Hall County
Objective 1: By January 1, 2007, to review all existing school and district financial procedures and provide recommendations for accountability and efficiency, after evaluating with an independent auditor. (5.0) January 2007: Angela Adams and Steve Ballowe
Objective 2: Bring all budget amendments to the Board each month prior to changes. (5.0 ) Monthly: Angela Adams
Objective 3: Complete all required fiscal reports in a timely fashion and meeting deadlines. Reports to the Board each semester. (4.8) October 2006 and May 2007: Angela Adams
Objective 4: Produce budget
documents and establish budget process as defined and approved by
the Board of Education. Produce budget book by May 1, 2007. (4.9)
Objective 5: Produce and distribute quarterly reports to the Board of Education, which indicate (a) amount budgeted, (b) amount spent, (c) amount encumbered, and (d) budget transfers/amendments. Note: Highlight budget amendments.(4.8) Quarterly: Angela Adams
Objective 6: By December 2006 to review all local supplements and provide a uniform system to fairly distribute new revenues when mandated. Review should consider making all supplements a fixed rather than a percentage of salary. Includes the addition of a Pro Therapy position. (4.5) December 2006: Angela Adams/Curtis Bibb
Objective 7: Complete and distribute fiscal audit no later than June 30, 2007 and propose a ‘no findings summary’ or identify corrective measures for any controls found to be inadequate. (4.0) June 2007: Angela Adams
Objective 8: Monitor site-based management policies with all training, reporting by February 2007. (4.0) February 2007: Angela Adams/Principals
Objective 9: Require all personnel receiving supplements for activities to complete a yearly syllabus and put online to be approved by the principal and assistant superintendent by August 30, 2006. (3.5) October 2006: Curtis Bibb, Mike Kemp, GMS Leadership Team
Objective 10: By July 2006 to coordinate the successful passage of SPLOST III. (3.5) August 2006: Steve Ballowe/Shirley Whitaker/David Shumake Results: Objective has been met.
Objective 11: By December 2006, to monitor a day-care program for GCSS personnel’s children and accounting issues. (3.5) December 2006: Shirley Whitaker/Curtis Bibb
Objective 12: To maintain a complete up-to-date fixed asset inventory. (2.0) May 2007: Angela Adams
GOAL 3:
To provide clean, safe and educationally
appropriate facilities conducive to learning. Objective 1: Continue to participate with the Superintendent in establishing a Culture of Success (a district/school environment fostering learning demonstrated by a total focus on the school vision, school mission, core of values, and strategic focus). Quarterly reports will be provided. (5.0) October 2006 and June 2007: Curtis Bibb/Principals
The 2006-2007 School Improvement Plan process includes the following goals:
Ø The beliefs, vision, and mission statement of the school and district are reviewed monthly by the Philosophy Design Vertical Faculty Team to be sure our programs, policies, and practices are consistent with our beliefs, supporting our vision, and helping to fulfill our mission.
Ø The Culture of Success statement is reviewed by all stakeholders. Fair Street has pledged that every member of the school community will be treated with dignity and respect. The faculty has an essential agreement to for peer monitoring to support this pledge.
Objective 2: To continue
planning for construction of a new middle school with monthly
reports. (5.0)
Objective 3: By January 2007 to craft a plan to provide revenues to support the acquisition of land for future school sites. (5.0) January 2007: Angela Adams/Christine Brosky/Steve Ballowe
Objective 4: By November 2006 to report on all partnerships, grants, costs and options to make Gainesville ‘wireless’. (4.5) November 2006: Keith Palmer
Objective 5: In September 2006 and January 2007 to report on roofing improvement plan.(4.0) September 2006 and January 2007: Curtis Bibb
Objective 6: To update a review of all campus crisis plans and campus safety controls by November 2006 to meet state and federal requirements with budget recommendations reported to the Board. (3.0) November 2006: Curtis Bibb
Fair Street IB Academy Emergency Procedures 2006-2007
Fire
Signal: Activation of fire alarm systemResponse Team: Campbell Art, Music, Modular Modular, Back-up Kelley Davis 300 Hall and Media Center ( Back-Up Hamilton) Brinson 400 Hall/ Gym (Back up: Rodriguez) Coy Severe and Profound (Back-Up: Rodriguez) Keep access roads open pending arrival of emergency vehicles (Back-up: Dyer) Dyer 200 Hall and Teacher Lounge Central (at flagpole): Holland(Back-Up: Jackson) Delgado and Jackson: Take Emergency Box and Student Information
1. Report fire to office; pull fire alarm/and or use intercom. 2. Close all windows and doors to confine fire. 3. Evacuate building to assigned placed at least 500 ft. from building. 4. Take class roll of students and green, yellow, and red cards. 5. Hold up red card if students missing; yellow if all students are not with you, but you know where they are, red if students are missing. Make list of missing students if possible. 6. Response Team report to areas. 7. Central command report to emergency department and superintendent. 8. Teachers report any student missing to response team. 9. Teachers remain with students. 10. Response team reports when area is clear. 11. Teachers and staff evacuate until an all-clear is given by intercom.
Bomb Threat
Signal: Message will be delivered by a courier or over intercom to evacuate the building. DO NOT USE A CELL PHONE OR ANY OTHER TECHNOLOGY THAT WORKS ON A FREQUENCY DURING A BOMB THREAT SITUATION.
Response: Same as for fire except hand-held radios should not be used.
Evacuation Response : Boys and Girls Club is the first site of evacuation. Students in front should evacuate to St. Paul’s or St. John’s Church or Gainesville Bank and Trust.
Intruder or Danger “CODE RED”
Signal: Intercom announcement of CODE RED or by courier
Response Team: Sweep through the areas assigned to you OR the area closest to your proximal location, gather any students, and secure yourself in a room. Holland/ Coy will alert police/ emergency agencies.
REMEMBER THAT THE OBJECTIVE IS TO LOCK IN EVERYONE QUICKLY!
in front of your door.
students are missing.
DO NOT PUSH IT TO FIND A STUDENT!!!
CODE RED IS OVER.
Objective 7: Update the Board of Education by January 1, 2007, on facility needs for the next five years, which will provide clean, safe and educationally appropriate classrooms and schools. Board will identify recommendation for each year, 2007-2010. (3.0) January 2007: Christine Brosky/Curtis Bibb/Angela Adams
The following needs are placed in priority order:
1- Replace roofing system ( in stages )
2- Modular building needs repair of interior walls and carpet 3- | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||